WFLA News Channel 8 The Tampa Tribune CentroTampa.com

TBO.com - Tampa Bay Online

Print This Print Bookmark and Share XML Feed For This Channel

TBO > News

Belleair Beach Bridge Closed Saturday Through Sunday

News Channel 8 photo by PAUL LAMISON

A new Belleair span will open Sunday and provide motorists continuous access as construction continues on the main bridge and causeway.

ADVERTISEMENT

Published: July 24, 2008

The Belleair Beach Causeway Bridge will be closed from Saturday evening through Sunday evening for work on a new span that is part of the overall replacement project.

Traffic to and from the beach will be rerouted south to the Intracoastal Waterway bridge in Indian Rocks Beach from 7 p.m. Saturday to 7 p.m. Sunday while the Belleair bridge is closed, Pinellas County officials said.

A new Belleair span will open Sunday and provide motorists continuous access as construction continues on the main bridge and causeway.

The $72.2-million, 1.7-mile causeway project will replace the Intracoastal Waterway drawbridge with a 74-foot-high fixed-span being built on the north side of the existing bridge. Construction is slated for completion in spring 2010.

Share this:
Loading Comments...
Loading
Print This Print Bookmark and Share XML Feed For This Channel
 

ADVERTISEMENT

Advertisement

IYP and SEO vendors: SEO by eLocalListing | Advertiser profiles
Oops! Your email could not be sent because of the following errors: