WFLA News Channel 8 The Tampa Tribune CentroTampa.com

TBO.com - Tampa Bay Online

Print This Print Bookmark and Share XML Feed For This Channel

TBO > News

Belleair Beach Bridge Closed Saturday Through Sunday

News Channel 8 photo by PAUL LAMISON

A new Belleair span will open Sunday and provide motorists continuous access as construction continues on the main bridge and causeway.

ADVERTISEMENT

Published: July 24, 2008

The Belleair Beach Causeway Bridge will be closed from Saturday evening through Sunday evening for work on a new span that is part of the overall replacement project.

Traffic to and from the beach will be rerouted south to the Intracoastal Waterway bridge in Indian Rocks Beach from 7 p.m. Saturday to 7 p.m. Sunday while the Belleair bridge is closed, Pinellas County officials said.

A new Belleair span will open Sunday and provide motorists continuous access as construction continues on the main bridge and causeway.

The $72.2-million, 1.7-mile causeway project will replace the Intracoastal Waterway drawbridge with a 74-foot-high fixed-span being built on the north side of the existing bridge. Construction is slated for completion in spring 2010.

Loading Comments...
Loading
Print This Print AddThis Social Bookmark Button XML Feed For This Channel
 

ADVERTISEMENT

Advertisement

IYP and SEO vendors: SEO by eLocalListing | Advertiser profiles
Oops! Your email could not be sent because of the following errors: